Gmmineralsplan

Timetable

The stages of the Greater Manchester Minerals Plan, and where the public can take part.

How the plan moves forward

The plan is prepared in stages. Each stage builds on the one before, and each formal step gives people a set period to read the material and respond.

Exact dates for each consultation are published when they are confirmed, and are listed here once they are fixed.

Sunlit meadow with tall grass and a line of hills

The first stage gathers evidence on the land and materials that the region relies on, and it is the basis for every later decision.

Stages

Stage 1

Evidence gathering

Demand, resources and existing permitted sites are surveyed and checked.

Stage 2

Draft options

Possible approaches to supply and protection are set out for comment.

Stage 3

Proposed policies

Preferred policies are drafted and tested against the evidence.

Stage 4

Examination and adoption

The submitted plan is examined independently before it is adopted.

Open field with a path running towards distant trees

Each consultation stage sets out how to respond, what questions are being asked, and how comments will be recorded and reported.

Taking part

  • Read the draft documents before responding.
  • Respond to the questions that relate to your area or interest.
  • Keep your comments specific and supported by evidence where possible.

Updates on each stage are posted on the latest news page.

Wooden gate beside a grassy path in early light

Once the plan is adopted, it will guide planning decisions for minerals sites across the region. Background on its purpose is on the background page.

Green hillside with a stone wall running along the slope

Restoration and aftercare are considered at every stage, so that the timetable also covers how land is returned to use after working ends.